Do You Have A Project We Can Help With?

Palisades Boulevard

JWS designed arterial roadway. Forced to stay within existing Right-of-Way this 50 MPH design speed roadway was vertically challenging. The roadway has split profiles.

Project Details

DATE

March 1, 2021

CLIENT

Palisades

PROJECT TYPE

Infrastructure, Hillside Development

LOCATION

Fountain Hills, AZ

Project Gallery

Contact Us

Name(Required)